Senin, 24 Desember 2012

prarancangan pabrik selulosa nitrat dari ampas tebu dengan kapasitas produksi 8000 ton/tahun

This preliminary of nitrocellulose factory desain use bagasse as raw material with production of capacity is 8.000 ton/year with work days 330 day per year. Form of this company is Limited Liability Company (Ltd) with structure method line and staff, with total of employees 163 people. The factory location was plans in Dondong sub district, North of Sumatera with width about 206.000 m2. Water sources of this factory obtain from wandu river in North of Sumatera. From economic analysis was obtained : a. Fixed Capital Investment = Rp. 399.169.369.504,- b. Working Capital Investment = Rp. 70.441.653.442,- c. Total Production Cost = Rp. 750.413.529.250,- d. Sales Prices = Rp. 976.445.963.388,- e. Profit = Rp. 169.524.325.603,- f. Internal Rate of Return (IRR) = 40,32% g. Pay Out Time (POT) = 2 tahun 3 bulan h. Break even Point (BEP) = 45 %

2 komentar:

  1. Mbk.... aq ria agustina mahasiswa teknik kimia lg proses redisign pabrik selulosa nitrat... aku boleh minta tlong gak mbk utk dpet soft file dr TA mbk utk aq jadiin acuan prarencana pabrik q.... terimakasih sebelumnya

    BalasHapus
  2. Mbk.... aq ria agustina mahasiswa teknik kimia lg proses redisign pabrik selulosa nitrat... aku boleh minta tlong gak mbk utk dpet soft file dr TA mbk utk aq jadiin acuan prarencana pabrik q.... terimakasih sebelumnya

    BalasHapus